Schematic Design Presentation
Meeting Notes
Please finalize any pending items within one week to maintain the project schedule. If we do not hear from you, we will move forward with the items presented. If you need more than one week to finalize decisions, please submit a Hold Request or Request for more Information.
DATE: 02/07/2025
LAYOUT/DESIGN DECISIONS:
Bar cabinetry approved as designed. Open shelves and surrounding trim to be eliminated.
PRODUCTS SELECTED:
Blue Cabinetry - color Naval
Backsplash - Mir Mosaic Natural Shell Collection South Beach SME-006
Rugs:
Entry - Elizabeth Navy Size: Pending field dimensions
APPROVED ACTIONS TO MOVE FORWARD:
Update rendering and elevations with tile selection and removal of open shelving.
Site meeting 02/11/2025
PENDING ITEMS:
Cabinet Door Style - SWARC to bring cabinet door options to site meeting 02/11/2025
Rug Selection - SWARC to bring rug options to site meeting 02/11/2025
Countertop - Southside Wood Works: Ash flat grain 1.5” thick, profile TBD, To be finalized 02/11/2025
Living Room Rug options for site approval: Finalize 02/11/2025
Roark - Pewter Blue
Nordic White
Avery Pewter
Dining Room - Pixel Indigo was selected, but it is no longer available. SWARC to bring additional options 02/11/2025
Final Selections:




Pending Selections:



Drawings and Renderings:





Drawing Markups and Sketches